Connect with us

City Government

Schaaf: “We will not have coal shipped through our city.”

Published

on

In a sharp email exchange, Oakland Mayor Libby Schaaf has blasted local developer Phil Tagami for moving ahead with a deal to export coal out of the former Oakland Army Base.

 

The digital dispute was documented in emails that the Sierra Club obtained through a Public Records Act request.

 

In 2013, Tagami had said use of the Army Base to bring coal to Oakland by rail and ship it abroad was the farthest thing from his mind. He said that his company, California Capital and Investment Group (CCIG), had “no interest or involvement in the pursuit of coal-related operations at the former Oakland Army Base.”

 

But that was then.

 

Mayor Libby Schaaf.

Mayor Libby Schaaf.

Schaaf wrote in an email to Tagami, dated May 11, that she was “extremely disappointed to once again hear” mention of the “possibility of shipping coal into Oakland” during a community breakfast.

 

“Stop it immediately,” Schaaf wrote. “You have been awarded the privilege and opportunity of a lifetime to develop this unique piece of land. You must respect the owner and public’s decree that we will not have coal shipped through our city.”

 

In response to the mayor’s email, Tagami explained that by entering into a binding contract with Terminal and Logistics Solutions (TLS), he and the city had agreed to “a complete transfer of our rights and obligations with respect to the terminal operations under the ground lease.”

 

Additionally, he states the scope of the binding deal “is not driven or defined by any single commodity, product, or good in transit,” claiming that the city cannot legally restrict what products flow through the rail terminal development.

 

What is essential to the new facility’s financial and legal viability, said Tagami, is “the ability to accommodate the full universe of bulk goods,” which includes coal.

 

Tagami claims that the binding legal contract signed by the city gives it no control over what commodities can be shipped. But according to a number of community members, under the contract’s “Regulation for Health and Safety” clause, the city can apply regulations for health-related reasons.

 

The clause states that the city has the right to apply regulations at any time after the agreement’s adoption if failure to do so “would place existing or future occupants or users of the project, adjacent neighbors, or any portion thereof, or all of them, in a condition substantially dangerous to their health or safety.”

 

According to Brian Beveridge, co-director of the West Oakland Environment Indicators Project (WOEIP) and West Oakland resident, there is ample evidence that shipping coal through Oakland would be detrimental to residents’ health.

 

“Coal dust is related to diesel pollution and the burning of fossil fuels,” said Beveridge. “It contains carcinogens and is likely the cause of black lung disease and asthma.”

 

“The whole community’s health is at stake. Our advances in cleaning air in West Oakland are at stake. The city’s pride in calling itself a green city is at stake.”

 

Community observers have also criticized the city’s lack of transparency in negotiations with developers of city land. The examples, they say, include the Oakland Army Base and sale of the parcel at Lake Merritt and East 12th Street.

 

“It’s completely in line with all these other development deals happening behind closed doors where the public is being cut out of the conversation,” said Jess Dervin-Ackerman of the Sierra Club’s San Francisco Bay Area chapter.

 

“All these proposals are on city-owned land and should be used for community benefits. What City Council is doing is just letting developers have at it.”

 

“We’re ready to back Mayor Schaaf if she’s ready to stand up and say ‘no’ to coal,” said Beveridge. “Oakland is unanimously opposed to shipping coal into or out of our city.”

Activism

Oakland Post: Week of February 25 – March 3, 2026

The printed Weekly Edition of the Oakland Post: Week of – February 25 – March 3, 2026

Published

on

To enlarge your view of this issue, use the slider, magnifying glass icon or full page icon in the lower right corner of the browser window.

Continue Reading

Activism

Oakland Post: Week of February 18 – 24, 2026

The printed Weekly Edition of the Oakland Post: Week of – February 18 – 24, 2026

Published

on

To enlarge your view of this issue, use the slider, magnifying glass icon or full page icon in the lower right corner of the browser window.

Continue Reading

Bay Area

CITY OF SAN LEANDRO STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION NOTICE TO BIDDERS FOR ANNUAL STREET OVERLAY/REHABILITATION 2019-21 – PHASE III

WORK DESCRIPTION: The work to be done consists of roadway paving, base cement stabilization, concrete curb ramps, driveways, sidewalks, curbs and gutters, traffic detection loops and pavement striping, and doing all appurtenant work in place and ready for use, all as shown on the plans and described in the specifications with the title indicated in Paragraph 1 above, and on file in the office of the City Engineer. Reference to said plans and specifications is hereby made for further particulars.

Published

on

PROJECT NO. 2020.0050

BID NO. 25-26.011

  1. BID OPENING: The bidder shall complete the “Proposal to the City of San Leandro” form contained in the Contract Book. The proposal shall be submitted in its entirety. Incomplete proposals will be considered non-responsive. Sealed bids containing the completed Proposal Section subject to the conditions named herein and in the specifications for ANNUAL STREET OVERLAY/REHABILITATION 2019-21 – PHASE III/PROJECT NO. 2020.0050 addressed to the City of San Leandro will be received at City Hall, 835 East 14th Street, 2nd Floor San Leandro at the office of the City Clerk up to 3:00 p.m. on Thursday, March 19, 2026, at which time they will be publicly opened and read.
  2. WORK DESCRIPTION: The work to be done consists of roadway paving, base cement stabilization, concrete curb ramps, driveways, sidewalks, curbs and gutters, traffic detection loops and pavement striping, and doing all appurtenant work in place and ready for use, all as shown on the plans and described in the specifications with the title indicated in Paragraph 1 above, and on file in the office of the City Engineer. Reference to said plans and specifications is hereby made for further particulars.
  3. OBTAINING THE PROJECT PLANS AND CONTRACT BOOK: The project plans and Contract Book may be obtained free of charge from the City’s website at:https://www.sanleandro.org/Bids.aspx Bidders who download the plans are encouraged to contact the City of San Leandro Public Works Department Engineering division at 510-577-3428 to be placed on the project planholder’s list to receive courtesy notifications of addenda and other project information. Project addenda, if any, will be posted on the website.  A bidder who fails to address all project addenda in its proposal may be deemed non-responsive.Bidders may also purchase the Project Plans and Contract Book from East Bay Blueprint & Supply Co., at 1745 14th Street, Oakland, CA 94606; Phone Number: (510) 261-2990 or email: ebbp@eastbayblueprint.com.
  4. PRE-BID CONFERENCE: A mandatory pre-bid conference will be held on Tuesday, February 24, 2026, at 2:00 PM and on Wednesday, February 25, 2026, at 10:00 AM as follows:
    Tuesday, February 24, 2026, at 2:00 PM
    Zoom Meeting ID: 883 8752 6074
    Passcode: 502955
    Zoom Link: https://sanleandro-org.zoom.us/j/88387526074?pwd=hZ5rjB8AWdLAUem3CtByFiZxqKarHj.1
    And
  5. Wednesday, February 25, 2026, at 10:00 AM
    Zoom Meeting ID: 898 2672 0472
    Passcode: 091848
    Zoom Link: https://sanleandro-org.zoom.us/j/89826720472?pwd=JgZX2nXMpLSRM5xDPr7EJUxl7QIznr.1The information presented at the conferences will be identical, all bidders must attend one of the pre-bid conference and sign the attendance sheet. A firm that didn’t attend the pre-bid conference isn’t qualified to bid on the project.Questions regarding the plans and specifications may be submitted in writing to the project engineer until 5:00 p.m. five (5) days before, excluding Saturdays, Sundays and Holidays, bids must be received by the City. The City will not respond to oral questions outside of the pre-bid conference. The response, if any, will be by written addendum only. Oral responses do not constitute a revision to these plans or specifications.
  6. VALUE OF WORK: The Engineer has estimated that the value of work is between $1,000,000 and $5,000,000.
  7. SAN LEANDRO BUSINESS PREFERENCE AND PARTICIPATION GOALS: The work performed under this contract is subject to Section 1-6-225 of the San Leandro Municipal Code regarding local business preference and participation. A list of companies that hold a San Leandro business license is located on the City webpage under the finance department, here: https://www.sanleandro.org/340/Business-License
  8. SAN LEANDRO COMMUNITY WORKFORCE AGREEMENT: The work performed under this contract is subject to the Community Workforce Agreement adopted by City Council Resolution 2015-104. Contractors attention is directed to Section 10.

Dated:  February 13, 2026                  Sarah Bunting, City Clerk 

Continue Reading

Subscribe to receive news and updates from the Oakland Post

* indicates required

CHECK OUT THE LATEST ISSUE OF THE OAKLAND POST

ADVERTISEMENT

WORK FROM HOME

Home-based business with potential monthly income of $10K+ per month. A proven training system and website provided to maximize business effectiveness. Perfect job to earn side and primary income. Contact Lynne for more details: Lynne4npusa@gmail.com 800-334-0540

Facebook

Trending

Copyright ©2021 Post News Group, Inc. All Rights Reserved.